San Joaquin, Fresno County, California · CAISO · operated by Wellhead Services, Inc
last reported to the EPA in 2015
2023 · headline year
Capacity in service86.8MW3 units · gas + storage
CO₂ emittedNot reported2023 · last reported 2015
Rank in California#278of 1,713 · by capacity · #2,643 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 40,085 MMBtu · reported
CO₂ emitted, t · 2011–15
Reported (through 2015)
Generating units
5 of 5 shown · 86.8 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GEN4
52.2
Natural Gas
Natural Gas Fired Combustion Turbine
2004
Operating
Unit GEN3
18.6
Natural Gas
Natural Gas Fired Combustion Turbine
2001
Operating
Unit BESS1
16.0
Storage
Batteries
2023
Operating
Unit GEN1
22.3
Natural Gas
Natural Gas Fired Combined Cycle
1990
Retired 2004
Unit GEN2
10.0
Natural Gas
Natural Gas Fired Combined Cycle
1990
Retired 2021
All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; energy capacity in MWh, charge and discharge rates and use cases; ownership stakes where a unit is jointly held.
86.8 MW across 3 generating units in service — 70.8 MW of natural gas and 16.0 MW of storage. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Wellhead Services, Inc, filed as independent power producer. 2 owner stakes are filed on jointly held units.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2007. The oldest operating unit is Unit GEN3 (2001); the newest is Unit BESS1 (2023).
When is it due to retire?
No retirement date has been filed for any operating unit at Fresno Cogeneration Partners, LP. An absent date means none is currently filed, not that the plant will run indefinitely.