Fuel spend$02023 · no purchased fuel
Capacity in service149MW2 units · solar + storage · incl. 74.5 MW online after 2023
Rank in Florida#51 (tied)of 310 · by capacity · #1,903 (tied) of 13,147 US
How big is FPL Chipola River Solar Energy Center?
149 MW across 2 generating units in service — 74.5 MW of solar and 74.5 MW of storage.
Who owns and operates it?
Operated by Florida Power & Light Co, filed as investor-owned utility.
Which grid does it sell into?
FPL (Florida Power & Light Company) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2024. The oldest operating unit is Unit 1 (2023); the newest is Unit 2 (2025).
When is it due to retire?
No retirement date has been filed for any operating unit at FPL Chipola River Solar Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (74.5 MW) and Batteries (74.5 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.