AMERICAN ENERGY ATLAS
Power·Arkansas

Fourche Creek Wastewater

Pulaski County, Arkansas · MISO · operated by Little Rock Water Reclamation Authority

2023 · headline year
Fuel spend$29,0992023 · estimate
Capacity in service1.3MW1 unit · gas
Rank in Arkansas#84of 108 · by capacity · #11,693 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Pulaski County · MISO · SERC

What it burns

2023 · reported

Share of reported fuel consumption

57% Landfill gas · 4,245 MMBtu · reported43% Natural gas · 3,139 MMBtu · reported · $29,099 est.

Landfill gas supplies 57% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 1.3 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 41.3Natural GasNatural Gas Internal Combustion Engine2009Operating
Unit 10.5BiogasOther Waste Biomass1983Retired 2010
Unit 20.5BiogasOther Waste Biomass1983Retired 2008
Unit 30.5BiogasOther Waste Biomass1983Retired 2011

All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Little Rock Water Reclamation Authority
Entity type
Municipally Owned Utility
Regulatory status
Not Regulated
Balancing authority
MISO
NERC region
SERC
EIA plant ID
10050

Common questions

How big is Fourche Creek Wastewater?
1.3 MW across 1 generating unit in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Little Rock Water Reclamation Authority, filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2009.
When is it due to retire?
No retirement date has been filed for any operating unit at Fourche Creek Wastewater. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas and natural gas.
How much does it spend on fuel?
An estimated $29,099 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Arkansas energyAll facilities in the state→City of Paris Solar1.5 MW operating capacity→ Paragould Solar Farm1.5 MW operating capacity→ City of Green Forest (Carroll)1.2 MW operating capacity→ Arkansas Valley1.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming