Fuel spend$02023 · no purchased fuel
Capacity in service3.0MW2 units · storage + solar
Rank in North Carolina#696 (tied)of 908 · by capacity · #8,746 (tied) of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases; ownership stakes where a unit is jointly held.
See the engineering record →
How big is Fort Bragg - Camp Mackall PV BESS System?
3.0 MW across 2 generating units in service — 2.0 MW of storage and 1.0 MW of solar.
Who owns and operates it?
Operated by Ameresco Federal Solutions, filed as commercial.
Which grid does it sell into?
CPLE (Duke Energy Progress East) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2023. Every operating unit came online in 2023.
When is it due to retire?
No retirement date has been filed for any operating unit at Fort Bragg - Camp Mackall PV BESS System. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Batteries (2.0 MW) and Solar Photovoltaic (1.0 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.