AMERICAN ENERGY ATLAS
Power·Minnesota

Flint Hills Resources Pine Bend, LLC

Dakota County, Minnesota · MISO · operated by Flint Hills Resources Pine Bend, LLC

2023 · headline year
Fuel spend$14.5M2023 · estimate
Capacity in service118MW3 units · gas + solar
Rank in Minnesota#34of 767 · by capacity · #2,157 of 13,147 US
Reported suppliersNot reported2023

Location

Dakota County · MISO · MRO

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 2.94 TBtu · reported · $14.5M est.

Reported fuel consumption, TBtu · 2022–23

012320222023
Reported (through 2023)

Generating units

3 of 3 shown · 118 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CTG60.5Natural GasNatural Gas Fired Combined Cycle2019Operating
Unit SOLAR45.0SolarSolar Photovoltaic2023Operating
Unit STG12.9Natural GasNatural Gas Fired Combined Cycle2019Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; panel technology, tracking and DC capacity.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Flint Hills Resources Pine Bend, LLC
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
MISO
NERC region
MRO
Gas pipeline
Northern Natural Gas
EIA plant ID
65405

Common questions

How big is Flint Hills Resources Pine Bend, LLC?
118 MW across 3 generating units in service — 73.4 MW of natural gas and 45.0 MW of solar.
Who owns and operates it?
Operated by Flint Hills Resources Pine Bend, LLC, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2021. The oldest operating units are Unit CTG and Unit STG (2019); the newest is Unit SOLAR (2023).
When is it due to retire?
No retirement date has been filed for any operating unit at Flint Hills Resources Pine Bend, LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $14.5M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Minnesota energyAll facilities in the state→MinnDakota Wind LLC150 MW operating capacity→ Elm Creek Wind II LLC149 MW operating capacity→ Laskin Energy Center116 MW operating capacity→ Walleye Wind110 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming