AMERICAN ENERGY ATLAS
Industrial + power·Massachusetts

Fitchburg Westminster Landfill Recycling Center

Westminster, Worcester County, Massachusetts · ISO-NE · operated by WM Renewable Energy LLC · owned by Waste Management Inc

2023 · headline year
Fuel spend$165,8512023 · estimate
Capacity in service4.8MW3 units · biomass
Net generation30.7GWh2023 · reported
CO₂ emitted30,720t2023 · reported to EPA · 4,688th highest of 6,030 in the US
Rank in Massachusetts#170 (tied)of 666 · by capacity · #7,658 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor73%2023

Location

Worcester County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 347,257 MMBtu · reported

CO₂ emitted, t · 2011–2023

025,00050,00075,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 4.8 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN11.6Landfill gasLandfill Gas2007Operating
Unit GEN21.6Landfill gasLandfill Gas2007Operating
Unit GEN31.6Landfill gasLandfill Gas2009Operating

All 3 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Waste Management Inc · 100%
Operating utility
WM Renewable Energy LLC
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1007753
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
56527

Common questions

How big is Fitchburg Westminster Landfill Recycling Center?
4.8 MW across 3 generating units in service.
Who owns and operates it?
Owned by Waste Management Inc (100%) and operated by WM Renewable Energy LLC, filed as industrial.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2008. The oldest operating units are Unit GEN1 and Unit GEN2 (2007); the newest is Unit GEN3 (2009).
When is it due to retire?
No retirement date has been filed for any operating unit at Fitchburg Westminster Landfill Recycling Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.
How much does it spend on fuel?
An estimated $165,851 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
30,720 t in 2023, reported to the EPA — the 4,688th highest of 6,030 US facilities that reported. Down from 49,276 t in 2011.

Related pages

Massachusetts energyAll facilities in the state→Overlook4.9 MW operating capacity→ Solten Plainville 6000, LLC4.9 MW operating capacity→ BWC Origination 184.8 MW operating capacity→ Chester Solar Farm4.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming