Sterling, Windham County, Connecticut · ISO-NE · operated by Pure Hedge LLC
Capacity shown is planned or not in service · last reported to the EPA in 2012
Proposed
A planned 90.0 MW solar photovoltaic project, filed to come online in 2025.
Planned capacity90.0MW2 units · not yet in service
CO₂ emittedNot reported2023 · last reported 2012
Reported suppliersNot reported2023
Location
CO₂ emitted, t · 2011–12
Reported (through 2012)
Generating units
3 of 3 shown · none in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit FSS17
70.0
Solar
Solar Photovoltaic
2025
Proposed
Unit FSS13
20.0
Storage
Batteries
2025
Proposed
Unit GEN1
31.3
Tire-derived fuel
All Other
1991
Retired 2017
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; ownership stakes where a unit is jointly held.