AMERICAN ENERGY ATLAS
Power·New Mexico

Escalante

Prewitt, McKinley County, New Mexico · WACM · operated by Tri-State G & T Assn, Inc · owned by Tri-State Generation & Transmission Assoc Inc

Linked units retired 2020 · co-located plant operating2023 · headline year
Retired capacity257MW1 unit · none in service
CO₂ emitted0t2023 · reported to EPA · joint 6,016th highest of 6,030 in the US
Rank in New Mexico#77of 77 · by reported CO₂ · #6,016 (tied) of 6,030 US
Reported suppliersNot reported2023 · last deliveries 2020

Location

McKinley County · WACM · WECC

CO₂ emitted, Mt · 2011–2023

0123201120172023
Reported (through 2023)

Generating units

1 of 1 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 1257.0SubbituminousConventional Steam Coal1984Retired 2020

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 242 deliveries are on record for 2011–2020.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Tri-State G & T Assn, Inc
Entity type
Cooperative
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001419
Balancing authority
WACM
NERC region
WECC
Gas pipeline
New Mexico Gas Company
EIA plant ID
87

Common questions

How big is Escalante?
257 MW across 1 unit, none of which is in service — all retired.
Who owns and operates it?
Owned by Tri-State Generation & Transmission Assoc Inc (100%) and operated by Tri-State G & T Assn, Inc, filed as cooperative.
Which grid does it sell into?
WACM (Western Area Power Administration - Rocky Mountain Region) is its balancing authority, inside NERC's WECC region.
When is it due to retire?
It has already retired — the last unit retired in 2020.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by subbituminous.
How much CO₂ does it emit?
0 t in 2023, reported to the EPA — the joint 6,016th highest of 6,030 US facilities that reported. Down from 1.9 Mt in 2011.

Also at this site

Escalante (NM)Same site · operating→

Related pages

New Mexico energyAll facilities in the state→Empire Abo Gas PlantIndustrial facility→ EPNG Station 6550 Monument Plant, NMIndustrial facility→ Freeport McMoRanPower facility→ Freeport McMoRan Cobre MiningPower facility→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming