AMERICAN ENERGY ATLAS
Industrial + power·Massachusetts

Erving Paper Mills Inc

Erving, Franklin County, Massachusetts · ISO-NE · operated by Erving Paper Mills Inc · owned by Erving Industries Inc

2023 · headline year
Fuel spend$8.38M2023 · estimate
Capacity in service6.2MW2 units · gas
Net generation42.7GWh2023 · reported
CO₂ emitted34,874t2023 · reported to EPA · 4,420th highest of 6,030 in the US
Rank in Massachusetts#112 (tied)of 666 · by capacity · #6,311 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor79%2023

Location

Franklin County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

99% Natural gas · 551,159 MMBtu · reported · $8.22M est.1% Oil & petroleum · 6,774 MMBtu · reported · $163,118 est.

Natural gas supplies 99% of the fuel energy it burned in 2023.

CO₂ emitted, t · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 6.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 35.6Natural GasNatural Gas Fired Combustion Turbine2015Operating
Unit 20.6Natural GasNatural Gas Steam Turbine2013Operating
Unit 12.5Residual oilPetroleum Liquids1988Retired 2011

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Erving Industries Inc · 100%
Operating utility
Erving Paper Mills Inc
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Pulp and Paper
EPA facility ID
1005037
Balancing authority
ISO-NE
NERC region
NPCC
Gas pipeline
Vermont Gas Systems Inc
EIA plant ID
54228

Common questions

How big is Erving Paper Mills Inc?
6.2 MW across 2 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Erving Industries Inc (100%) and operated by Erving Paper Mills Inc, filed as industrial.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2015. The oldest operating unit is Unit 2 (2013); the newest is Unit 3 (2015).
When is it due to retire?
No retirement date has been filed for any operating unit at Erving Paper Mills Inc. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $8.38M in 2023 — natural gas $8.22M and oil & petroleum $163,118. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
34,874 t in 2023, reported to the EPA — the 4,420th highest of 6,030 US facilities that reported. Up from 26,379 t in 2011.

Related pages

Massachusetts energyAll facilities in the state→Dartmouth6.3 MW operating capacity→ Maple(CSG)6.3 MW operating capacity→ CES Agawam Tuckahoe Solar Hybrid6.2 MW operating capacity→ Saddleback Solar6.1 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming