Industrial + power·South Carolina
Enoree Landfill
Greer, Greenville County, South Carolina · DUK · operated by Enerdyne Power Systems Inc · owned by County of Greenville South Carolina
Generating units retired 20242023 · headline year
Retired — its last generating unit went out of service in 2024, ending 3.2 MW of capacity.
Retired capacity3.2MW2 units · none in service
CO₂ emitted64,870t2023 · reported to EPA · 3,177th highest of 6,030 in the US
Rank in South Carolina#45of 83 · by reported CO₂ · #3,177 of 6,030 US
Reported suppliersNot reported2023
Location
What its on-site power plant burns
2023 · reported
Share of reported fuel consumption
100% Landfill gas · 7,853 MMBtu · reported
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
2 of 2 shown · none in service
All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →
Who supplies the fuel
2023
No fuel deliveries are reported for 2023.
In the Atlas
- Spend and volume trend15 years
- Unit-level fuel and emissions1 unit-fuel record for 2023
Open in the Atlas →
Ownership & operations
- Operating utility
- Enerdyne Power Systems Inc
- Entity type
- Independent Power Producer
- Regulatory status
- Not Regulated
- Industry sector
- Waste
- EPA facility ID
- 1004074
- Balancing authority
- DUK
- NERC region
- SERC
- EIA plant ID
- 56951
Common questions
How big is Enoree Landfill?
3.2 MW across 2 units, none of which is in service — all retired.
Who owns and operates it?
Which grid does it sell into?
DUK (Duke Energy Carolinas) is its balancing authority, inside NERC's SERC region.
When is it due to retire?
It has already retired — the last unit retired in 2024.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned landfill gas.
How much CO₂ does it emit?
64,870 t in 2023, reported to the EPA — the 3,177th highest of 6,030 US facilities that reported. Down from 115,739 t in 2011.