Power·Mississippi
Enid Lake Hydroelectric Project
Panola County, Mississippi · TVA · operated by Rye Development
Capacity shown is planned or not in service
Proposed
A planned 5.0 MW conventional hydroelectric project, filed to come online in 2028.
Planned capacity5.0MW2 units · not yet in service
Location
Generating units
2 of 2 shown · none in service
All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →
Ownership & operations
- Operating utility
- Rye Development
- Entity type
- Independent Power Producer
- Regulatory status
- Not Regulated
- Balancing authority
- TVA
- NERC region
- SERC
- EIA plant ID
- 62432
Common questions
How big is Enid Lake Hydroelectric Project?
5.0 MW across 2 units, none of which is in service — all planned.
Who owns and operates it?
Operated by Rye Development, filed as independent power producer.
Which grid does it sell into?
TVA (Tennessee Valley Authority) is its balancing authority, inside NERC's SERC region.
What does it run on?
Conventional Hydroelectric (5.0 MW).
Related pages
Select a state