Hutchinson County, Texas · SPP · operated by Orion Engineered Carbons
2023 · headline year
Capacity in service20.0MW1 unit · gas
Net generation40.5GWh2023 · reported
Rank in Texas#571 (tied)of 941 · by capacity · #4,406 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor23%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Refinery gas · 663,938 MMBtu · reported
Reported fuel consumption, TBtu · 2011–2023
Reported (through 2023)
Generating units
1 of 1 shown · 20.0 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GEN1
20.0
Other gas
Other Gases
1982
Operating
1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.
Operated by Orion Engineered Carbons, filed as industrial.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1982.
When is it due to retire?
No retirement date has been filed for any operating unit at Engineered Carbons Borger Cogen. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?