Navarro County, Texas · ERCOT · operated by Birch Creek Development
Capacity shown is planned or not in service
A planned 175 MW solar photovoltaic project, filed to come online in 2026.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit ELMFL | 125.0 | Solar | Solar Photovoltaic | 2026 | Proposed |
| Unit ELMBA | 50.0 | Storage | Batteries | 2026 | Proposed |
All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit ELMBA | new unit | 2026 | 50.0 MW |
| Unit ELMFL | new unit | 2026 | 125 MW |