Willacy County, Texas · ERCOT · operated by El Sauz Ranch Wind, LLC
Capacity shown is planned or not in service
A planned 301 MW onshore wind turbine project, filed to come online in 2025.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit ELSAU | 301.0 | Wind | Onshore Wind Turbine | 2025 | Proposed |
1 unit shown. Behind it, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit ELSAU | new unit | 2025 | 301 MW |