AMERICAN ENERGY ATLAS
Power·Texas

Ector County Energy Center

Goldsmith, Texas · ERCOT · operated by Ector County Generation, LLC · owned by Jackrabbit Power Holdings, LLC

2023 · headline year
Fuel spend$12.8M2023 · estimate
Capacity in service359MW2 units · gas
Net generation426GWh2023 · reported
CO₂ emitted268,129t2023 · reported to EPA · 1,314th highest of 6,030 in the US
Rank in Texas#128of 941 · by capacity · #872 (tied) of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor14%2023

Location

ERCOT · TRE

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 4.73 TBtu · reported · $12.8M est.

CO₂ emitted, t · 2015–23

0200,000400,000600,000201520192023
Reported (through 2023)

Generating units

2 of 2 shown · 359 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CTG1179.4Natural GasNatural Gas Fired Combustion Turbine2015Operating
Unit CTG2179.4Natural GasNatural Gas Fired Combustion Turbine2015Operating

All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →
UnitEventWhenMW
Unit CTG1uprate2025-070.0 MW
Unit CTG2uprate2025-070.0 MW

Who supplies the fuel

1 of 1 supplier · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Sequent Energy ManagementNatural gas4.73n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

The supplier is shown. Subscribe to see every one of the 209 deliveries recorded 2015–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Jackrabbit Power Holdings, LLC · 100%
Operating utility
Ector County Generation, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1011896
Balancing authority
ERCOT
NERC region
Texas RE (TRE)
Gas pipeline
Oneok Wes Tex Transmission LLC
EIA plant ID
58471

Common questions

How big is Ector County Energy Center?
359 MW across 2 generating units in service.
Who owns and operates it?
Owned by Jackrabbit Power Holdings, LLC (100%) and operated by Ector County Generation, LLC, filed as independent power producer.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 2015. Every operating unit came online in 2015.
When is it due to retire?
No retirement date has been filed for any operating unit at Ector County Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $12.8M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
268,129 t in 2023, reported to the EPA — the 1,314th highest of 6,030 US facilities that reported. Up from 27,449 t in 2015.

Related pages

Texas energyAll facilities in the state→Stephens Ranch Wind Energy LLC376 MW operating capacity→ Western Trail Wind, LLC367 MW operating capacity→ Foard City Wind353 MW operating capacity→ Knox Lee Power Plant351 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming