Kingsport, Sullivan County, Tennessee · PJM · operated by Eastman Chemical Co-TN Ops · owned by Eastman Chemical Co
The 3rd-largest reported CO₂ emitter among facilities in Tennessee — 3.68 Mt in 2023, first unit online in 1936, newest in 1994.
Natural gas supplies 55% of the fuel energy its on-site power plant burned in 2023.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit TG25 | 18.0 | Bituminous coal | Conventional Steam Coal | 1994 | Operating |
| Unit TG24 | 16.8 | Natural Gas | Natural Gas Steam Turbine | 1983 | Operating |
| Unit TG26 | 16.6 | Bituminous coal | Conventional Steam Coal | 1994 | Operating |
| Unit TG22 | 15.4 | Bituminous coal | Conventional Steam Coal | 1982 | Operating |
| Unit TG21 | 15.0 | Natural Gas | Natural Gas Steam Turbine | 1969 | Operating |
| Unit TG16 | 10.4 | Natural Gas | Natural Gas Steam Turbine | 1966 | Operating |
| Unit TG17 | 10.4 | Natural Gas | Natural Gas Steam Turbine | 1966 | Operating |
| Unit TG18 | 10.4 | Natural Gas | Natural Gas Steam Turbine | 1967 | Operating |
| Unit TG19 | 10.4 | Natural Gas | Natural Gas Steam Turbine | 1970 | Operating |
| Unit TG20 | 10.4 | Natural Gas | Natural Gas Steam Turbine | 1972 | Operating |
| Unit TG14 | 10.0 | Bituminous coal | Conventional Steam Coal | 1962 | Operating |
| Unit TG15 | 7.5 | Bituminous coal | Conventional Steam Coal | 1963 | Operating |
| Unit TG13 | 7.0 | Bituminous coal | Conventional Steam Coal | 1960 | Operating |
| Unit TG10 | 6.0 | Bituminous coal | Conventional Steam Coal | 1946 | Operating |
| Unit TG11 | 6.0 | Bituminous coal | Conventional Steam Coal | 1949 | Operating |
| Unit TG12 | 6.0 | Bituminous coal | Conventional Steam Coal | 1953 | Operating |
| Unit TGO7 | 6.0 | Bituminous coal | Conventional Steam Coal | 1936 | Operating |
| Unit TGO8 | 6.0 | Bituminous coal | Conventional Steam Coal | 1939 | Operating |
| Unit TGO9 | 6.0 | Bituminous coal | Conventional Steam Coal | 1941 | Operating |
All 19 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
See the engineering record →| Supplier | Fuel | Delivered TBtu | Tons | Mine of origin | Transport |
|---|---|---|---|---|---|
| Centerpoint Energy | Natural gas | 20.6 | n/a | n/a | Pipeline |
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 6 suppliers. Subscribe to see all 6, every one of the 1,170 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
See all 6 suppliers →