AMERICAN ENERGY ATLAS
Power·Maryland

Eastern Correctional Institute

Somerset County, Maryland · PJM · operated by Maryland Environmental Service

2023 · headline year
Fuel spend$275,5872023 · estimate
Capacity in service3.8MW2 units · biomass + gas · 2 more on standby or out of service
Net generation2.88GWh2023 · reported
Rank in Maryland#64 (tied)of 210 · by capacity · #8,289 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Somerset County · PJM · RFC

What it burns

2023 · reported

Share of reported fuel consumption

95% Biomass · 231,693 MMBtu · reported5% Oil & petroleum · 11,889 MMBtu · reported · $275,587 est.

Biomass supplies 95% of the fuel energy it burned in 2023.

Reported fuel consumption, TBtu · 2011–2023

00.511.5201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 3.8 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 11471.9WoodWood/Wood Waste Biomass1987Operating
Unit 11481.9Natural GasNatural Gas Steam Turbine1987Operating
Unit DG11.0Distillate oilPetroleum Liquids1988Standby
Unit DG21.0Distillate oilPetroleum Liquids1988Standby

All 4 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Maryland Environmental Service
Entity type
State-Owned Utility
Regulatory status
Not Regulated
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
10693

Common questions

How big is Eastern Correctional Institute?
3.8 MW across 2 generating units in service — 1.9 MW of biomass and 1.9 MW of natural gas. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Maryland Environmental Service, filed as state-owned utility.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1987. Every operating unit came online in 1987.
When is it due to retire?
No retirement date has been filed for any operating unit at Eastern Correctional Institute. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass and oil & petroleum.
How much does it spend on fuel?
An estimated $275,587 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Maryland energyAll facilities in the state→NIST Solar4.0 MW operating capacity→ Oaks Landfill Gas-to-Energy Facility4.0 MW operating capacity→ THD Baltimore DCs - 5829 Project Lion3.8 MW operating capacity→ Millersville Landfill3.2 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming