Proctor, Marshall County, West Virginia · PJM · operated by Westlake Chemical Natrium Plant · owned by Westlake Chemical Corp
2023 · headline year
Fuel spend$44.2M2023 · estimate
Capacity in service116MW3 units · gas
Net generation667GWh2023 · reported
CO₂ emitted598,986t2023 · reported to EPA · 849th highest of 6,030 in the US
Rank in West Virginia#14of 40 · by capacity · #2,181 (tied) of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor66%2023
Location
What its on-site power plant burns
2023 · reported
Share of reported fuel consumption
95% Natural gas · 7.34 TBtu · reported · $44.2M est.5% Refinery gas · 0.378 TBtu · reported
Natural gas supplies 95% of the fuel energy its on-site power plant burned in 2023.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
4 of 4 shown · 116 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GEN7
82.0
Natural Gas
Natural Gas Steam Turbine
1966
Operating
Unit GEN6
26.0
Natural Gas
Natural Gas Steam Turbine
1954
Operating
Unit GEN4
7.5
Natural Gas
Natural Gas Steam Turbine
1943
Operating
Unit GEN3
7.5
Natural Gas
Natural Gas Steam Turbine
1943
Retired 2018
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 250 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
116 MW across 3 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Westlake Chemical Corp (100%) and operated by Westlake Chemical Natrium Plant, filed as industrial.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1962. The oldest operating unit is Unit GEN4 (1943); the newest is Unit GEN7 (1966).
When is it due to retire?
No retirement date has been filed for any operating unit at Eagle Natrium LLC - Natrium Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas and refinery gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $44.2M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
598,986 t in 2023, reported to the EPA — the 849th highest of 6,030 US facilities that reported. Down from 811,720 t in 2011.