Starke County, Indiana · MISO · operated by Dunns Bridge II Solar and Storage Generation LLC
Capacity shown is planned or not in service
A planned 491 MW solar photovoltaic project, filed to come online in 2025.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit DB2PV | 435.0 | Solar | Solar Photovoltaic | 2025 | Proposed |
| Unit DB2BS | 56.3 | Storage | Batteries | 2025 | Proposed |
All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit DB2BS | new unit | 2025 | 56.3 MW |
| Unit DB2PV | new unit | 2025 | 435 MW |