AMERICAN ENERGY ATLAS
Power·New Jersey

DTE Atlantic, LLC

Atlantic City, Atlantic County, New Jersey · PJM · operated by DTE Atlantic, LLC · owned by DTE Energy Co

2023 · headline year
Fuel spend$1.97M2023 · estimate
Capacity in service7.5MW1 unit · gas
Net generation55.3GWh2023 · reported
CO₂ emitted37,638t2023 · reported to EPA · 4,278th highest of 6,030 in the US
Rank in New Jersey#89 (tied)of 407 · by capacity · #6,038 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor84%2023

Location

Atlantic County · PJM · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 640,330 MMBtu · reported · $1.97M est.

CO₂ emitted, t · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 7.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit ACB-17.5Natural GasNatural Gas Fired Combustion Turbine2010Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
DTE Energy Co · 100%
Operating utility
DTE Atlantic, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1008787
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
62492

Common questions

How big is DTE Atlantic, LLC?
7.5 MW across 1 generating unit in service.
Who owns and operates it?
Owned by DTE Energy Co (100%) and operated by DTE Atlantic, LLC, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2010.
When is it due to retire?
No retirement date has been filed for any operating unit at DTE Atlantic, LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $1.97M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
37,638 t in 2023, reported to the EPA — the 4,278th highest of 6,030 US facilities that reported. Down from 47,096 t in 2011.

Also at this site

Atlantic City Convention CenterSame site · operating→

Related pages

New Jersey energyAll facilities in the state→Frenchtown III Solar7.9 MW operating capacity→ Parkland Landfill Solar7.8 MW operating capacity→ Hamilton Solar-Crosswicks7.5 MW operating capacity→ Jersey-Atlantic Wind Farm7.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming