AMERICAN ENERGY ATLAS
Industrial + power·Oregon

Dry Creek Landfill

White City, Jackson County, Oregon · PACW · operated by Oregon Environmental Industries LLC · owned by Waste Connections US Inc

2023 · headline year
Capacity in service3.2MW2 units · biomass
Net generation13.5GWh2023 · reported
CO₂ emitted62,696t2023 · reported to EPA · 3,248th highest of 6,030 in the US
Rank in Oregon#169 (tied)of 278 · by capacity · #8,612 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor48%2023

Location

Jackson County · PACW · WECC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 168,091 MMBtu · reported

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 3.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit DC11.6Landfill gasLandfill Gas2007Operating
Unit DC21.6Landfill gasLandfill Gas2007Operating

All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →
UnitEventWhenMW
Unit DC1retirement2026-031.6 MW
Unit DC2retirement2026-031.6 MW

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Waste Connections US Inc · 100%
Operating utility
Oregon Environmental Industries LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1005652
Balancing authority
PACW
NERC region
WECC
EIA plant ID
56461

Common questions

How big is Dry Creek Landfill?
3.2 MW across 2 generating units in service.
Who owns and operates it?
Owned by Waste Connections US Inc (100%) and operated by Oregon Environmental Industries LLC, filed as independent power producer.
Which grid does it sell into?
PACW (PacifiCorp - West) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2007. Every operating unit came online in 2007.
When is it due to retire?
Planned retirement dates are filed for 2 of 2 operating units: Unit DC1 (2026) and Unit DC2 (2026).
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned landfill gas.
How much CO₂ does it emit?
62,696 t in 2023, reported to the EPA — the 3,248th highest of 6,030 US facilities that reported. Down from 67,991 t in 2011.

Related pages

Oregon energyAll facilities in the state→Wagon Trail LLC3.3 MW operating capacity→ Short Mountain Landfill3.2 MW operating capacity→ East Side3.2 MW operating capacity→ SulusSolar173.1 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming