Tuolumne County, California · TIDC · operated by Turlock Irrigation District
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 1 | 45.5 | Water | Conventional Hydroelectric | 1971 | Operating |
| Unit 2 | 45.5 | Water | Conventional Hydroelectric | 1971 | Operating |
| Unit 3 | 45.5 | Water | Conventional Hydroelectric | 1971 | Operating |
| Unit 4 | 34.3 | Water | Conventional Hydroelectric | 1989 | Operating |
All 4 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit 1 | uprate | 2026-10 | 20.0 MW |
| Unit 2 | uprate | 2027-10 | 20.0 MW |
| Unit 3 | uprate | 2028-10 | 20.0 MW |
| Unit 4 | uprate | 2029-09 | 1.3 MW |