Biomass supplies 99% of the fuel energy it burned in 2023.
Reported fuel consumption, TBtu · 2011–2023
Reported (through 2023)
Generating units
6 of 6 shown · 40.0 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GEN4
11.5
Wood
Wood/Wood Waste Biomass
1955
Operating
Unit GEN5
11.5
Wood
Wood/Wood Waste Biomass
1955
Operating
Unit GEN6
11.5
Wood
Wood/Wood Waste Biomass
1955
Out of service
Unit GEN3
7.0
Wood
Wood/Wood Waste Biomass
1955
Operating
Unit GEN1
5.0
Wood
Wood/Wood Waste Biomass
1955
Operating
Unit GEN2
5.0
Wood
Wood/Wood Waste Biomass
1955
Operating
All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.
40.0 MW across 5 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Roseburg Forest Products Co, filed as industrial.
Which grid does it sell into?
PACW (PacifiCorp - West) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1955. Every operating unit came online in 1955.
When is it due to retire?
No retirement date has been filed for any operating unit at Dillard Complex. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?