Power·California
DGS Central Utility Plant
Sacramento County, California · BANC · operated by State of CA DGS BPM
Capacity shown is planned or not in service
Standby
Standby capacity3.9MW3 units · none in service
Reported suppliersNot reported2023
Location
Reported fuel consumption, MMBtu · 2013–19
Reported (through 2019)
Generating units
3 of 3 shown · none in service
All 3 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.
See the engineering record →
Who supplies the fuel
2023
No fuel deliveries are reported for 2023.
Ownership & operations
- Operating utility
- State of CA DGS BPM
- Entity type
- State-Owned Utility
- Regulatory status
- Not Regulated
- Balancing authority
- BANC
- NERC region
- WECC
- Gas pipeline
- Pacific Gas
- EIA plant ID
- 58593
Common questions
How big is DGS Central Utility Plant?
3.9 MW across 3 units, none of which is in service — all on standby or out of service.
Who owns and operates it?
Operated by State of CA DGS BPM, filed as state-owned utility.
Which grid does it sell into?
BANC (Balancing Authority of Northern California) is its balancing authority, inside NERC's WECC region.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by natural gas and distillate oil.
Related pages
Select a state