Power·Nevada

Desert Star Energy Center

Boulder City, Clark County, Nevada · CAISO · operated by Desert Star Energy Center SDG&E · owned by Sempra Energy

2023 · headline year
Reported fuel cost$63.7M2023 · reported deliveries
Capacity in service537MW3 units · gas
Net generation1.65TWh2023 · reported
CO₂ emitted679,414t2023 · reported to EPA · 795th highest of 6,030 in the US
Rank in Nevada#11of 111 · by capacity · #666 of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor35%2023

Location

Clark County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 12.4 TBtu · reported

CO₂ emitted, Mt · 2011–2023

00.511.5201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 537 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit ED03195.5Natural GasNatural Gas Fired Combined Cycle2000Operating
Unit ED01170.9Natural GasNatural Gas Fired Combined Cycle2000Operating
Unit ED02170.9Natural GasNatural Gas Fired Combined Cycle2000Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →
UnitEventWhenMW
Unit ED01retirement2027-04171 MW
Unit ED02retirement2027-04171 MW
Unit ED03retirement2027-04196 MW

Who supplies the fuel

1 of 1 supplier · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Southwest GasNatural gas12.4n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

The supplier is shown. Subscribe to see every one of the 153 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Sempra Energy · 100%
Operating utility
Desert Star Energy Center SDG&E
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001306
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
55077

Common questions

How big is Desert Star Energy Center?
537 MW across 3 generating units in service.
Who owns and operates it?
Owned by Sempra Energy (100%) and operated by Desert Star Energy Center SDG&E, filed as investor-owned utility.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2000. Every operating unit came online in 2000.
When is it due to retire?
Planned retirement dates are filed for 3 of 3 operating units: Unit ED01 (2027), Unit ED02 (2027) and Unit ED03 (2027).
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $63.7M in 2023.
How much CO₂ does it emit?
679,414 t in 2023, reported to the EPA — the 795th highest of 6,030 US facilities that reported. Down from 1.07 Mt in 2011.

Related pages

Nevada energyAll facilities in the state→Apex Generating Station601 MW operating capacity→ North Valmy567 MW operating capacity→ TS Power Plant442 MW operating capacity→ Las Vegas Cogeneration359 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming