AMERICAN ENERGY ATLAS
Power·California

Delano Energy Center, LLC

Delano, Tulare County, California · CAISO · operated by Wellhead Services, Inc

last reported to the EPA in 2016

2023 · headline year
Capacity in service60.5MW1 unit · gas
Net generation2.05GWh2023 · reported
CO₂ emittedNot reported2023 · last reported 2016
Rank in California#331 (tied)of 1,713 · by capacity · #3,218 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

Tulare County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 24,763 MMBtu · reported

CO₂ emitted, t · 2013–16

010,00020,00030,000201320142016
Reported (through 2016)

Generating units

1 of 1 shown · 60.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN160.5Natural GasNatural Gas Fired Combustion Turbine2013Operating

1 unit shown. Behind it, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Wellhead Services, Inc
Jointly held units
California Holdings Delano 2 LLC 1% of 1 unit
California Holdings Delano LLC 99% of 1 unit
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1011190
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
58122

Common questions

How big is Delano Energy Center, LLC?
60.5 MW across 1 generating unit in service.
Who owns and operates it?
Operated by Wellhead Services, Inc, filed as independent power producer. 2 owner stakes are filed on jointly held units.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2013.
When is it due to retire?
No retirement date has been filed for any operating unit at Delano Energy Center, LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.

Related pages

California energyAll facilities in the state→CalPeak Power - Panoche LLC60.5 MW operating capacity→ CalPeak Power - Vaca Dixon LLC60.5 MW operating capacity→ El Cajon Energy Center60.5 MW operating capacity→ Lake60.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming