Androscoggin County, Maine · ISO-NE · operated by Brookfield White Pine Hydro LLC
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit DR6 | 1.8 | Water | Conventional Hydroelectric | 1919 | Operating |
| Unit DR7 | 1.0 | Water | Conventional Hydroelectric | 1924 | Operating |
| Unit DR3 | 0.9 | Water | Conventional Hydroelectric | 1906 | Operating |
| Unit DR4 | 0.8 | Water | Conventional Hydroelectric | 1911 | Operating |
| Unit DR5 | 0.8 | Water | Conventional Hydroelectric | 1913 | Operating |
| Unit DR1 | 0.6 | Water | Conventional Hydroelectric | 1903 | Operating |
| Unit DR2 | 0.6 | Water | Conventional Hydroelectric | 1903 | Operating |
All 7 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →