Deer Park, Harris County, Texas · ERCOT · operated by Deer Park Energy Center · owned by CPN Management LP
2023 · headline year
Fuel spend$194M2023 · estimate
Capacity in service1,176MW6 units · gas
Net generation6.87TWh2023 · reported
CO₂ emitted3.66Mt2023 · reported to EPA · 118th highest of 6,030 in the US
Rank in Texas#21of 941 · by capacity · #240 (tied) of 13,147 US
Reported suppliers42023 · 38 deliveries
Capacity factor67%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 71.9 TBtu · reported · $194M est.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
6 of 6 shown · 1,176 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit STG1
276.0
Natural Gas
Natural Gas Fired Combined Cycle
2004
Operating
Unit CTG1
180.0
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
Unit CTG2
180.0
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
Unit CTG3
180.0
Natural Gas
Natural Gas Fired Combined Cycle
2004
Operating
Unit CTG4
180.0
Natural Gas
Natural Gas Fired Combined Cycle
2004
Operating
Unit CTG6
180.0
Natural Gas
Natural Gas Fired Combined Cycle
2014
Operating
All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 4 suppliers. Subscribe to see all 4, every one of the 514 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by CPN Management LP (100%) and operated by Deer Park Energy Center, filed as independent power producer.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 2005. The oldest operating units are Unit CTG1 and Unit CTG2 (2003); the newest is Unit CTG6 (2014).
When is it due to retire?
No retirement date has been filed for any operating unit at Deer Park Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 4 suppliers in 2023.
How much does it spend on fuel?
An estimated $194M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
3.66 Mt in 2023, reported to the EPA — the 118th highest of 6,030 US facilities that reported. Up from 3.22 Mt in 2011.