Fuel spend$526,9692023 · estimate
Capacity in service78.7MW2 units · oil
Net generation1.69GWh2023 · reported
CO₂ emitted1,856t2023 · reported to EPA · 5,949th highest of 6,030 in the US
Rank in Iowa#93of 256 · by capacity · #2,798 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2012
Capacity factor0%2023
How big is Dayton Avenue Substation?
78.7 MW across 2 generating units in service.
Who owns and operates it?
Owned by
City of Ames Iowa (100%) and operated by City of Ames - (IA), filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1996. The oldest operating unit is Unit GT1 (1972); the newest is Unit GT2 (2005).
When is it due to retire?
No retirement date has been filed for any operating unit at Dayton Avenue Substation. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.
How much does it spend on fuel?
An estimated $526,969 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
1,856 t in 2023, reported to the EPA — the 5,949th highest of 6,030 US facilities that reported. Up from 742 t in 2011.