Rock County, Wisconsin · MISO · operated by Wisconsin Electric Power Co
Capacity shown is planned or not in service
A planned 250 MW solar photovoltaic project, filed to come online in 2025.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 1 | 250.0 | Solar | Solar Photovoltaic | 2025 | Proposed |
| Unit 2 | 75.0 | Storage | Batteries | not reported | Canceled |
All 2 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit 1 | new unit | 2025 | 250 MW |