AMERICAN ENERGY ATLAS
Power·Michigan

Dan E Karn

Essexville, Bay County, Michigan · MISO · operated by Consumers Energy Co - (MI) · owned by CMS Energy Corp

2023 · headline year
Fuel spend$25.4M2023 · estimate
Capacity in service1,402MW2 units · gas
Net generation613GWh2023 · reported
CO₂ emitted719,951t2023 · reported to EPA · 766th highest of 6,030 in the US
Rank in Michigan#7of 258 · by capacity · #166 of 13,147 US
Reported suppliers62023 · 33 deliveries
Capacity factor5%2023

Location

Bay County · MISO · RFC

What it burns

2023 · reported

Share of reported fuel consumption

87% Coal · 6.41 TBtu · reported · $17.6M est.11% Natural gas · 0.832 TBtu · reported · $6.22M est.1% Oil & petroleum · 0.0986 TBtu · reported · $1.5M est.

Coal supplies 87% of the fuel energy it burned in 2023. Per unit of heat, natural gas costs Dan E Karn an estimated 2.7× more than coal.

CO₂ emitted, Mt · 2011–2023

0246201120172023
Reported (through 2023)

Generating units

9 of 9 shown · 1,402 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 4709.8Natural GasNatural Gas Steam Turbine1977Operating
Unit 3692.5Natural GasNatural Gas Steam Turbine1975Operating
Unit 7156.3SubbituminousConventional Steam Coal1955Retired 2016
Unit 8156.3SubbituminousConventional Steam Coal1958Retired 2016
Unit 1A136.0SubbituminousConventional Steam Coal1959Retired 2023
Unit 1B136.0SubbituminousConventional Steam Coal1959Retired 2023
Unit 2A136.0SubbituminousConventional Steam Coal1961Retired 2023
Unit 2B136.0SubbituminousConventional Steam Coal1961Retired 2023
Unit A18.6Natural GasNatural Gas Fired Combustion Turbine1968Retired 2015

All 9 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 6 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Arch Coal SalesCoal1.98110,631Black Thunder, WyomingRail

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).

Showing 1 of 6 suppliers. Subscribe to see all 6, every one of the 1,330 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 6 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
CMS Energy Corp · 100%
Operating utility
Consumers Energy Co - (MI)
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1007374
Balancing authority
MISO
NERC region
ReliabilityFirst (RFC)
Gas pipeline
Consumers Gas Util Co
EIA plant IDs
1702 · 1720

Common questions

How big is Dan E Karn?
1,402 MW across 2 generating units in service. A further 7 units are listed as standby, out of service, planned, retired or canceled. The total spans EIA plants 1702 and 1720, filed under one facility.
Who owns and operates it?
Owned by CMS Energy Corp (100%) and operated by Consumers Energy Co - (MI), filed as investor-owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1976. The oldest operating unit is Unit 3 (1975); the newest is Unit 4 (1977).
When is it due to retire?
No retirement date has been filed for any operating unit at Dan E Karn. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned coal, natural gas and oil & petroleum. Coal delivered in 2023 came from 2 coal suppliers, from mines in Wyoming — principally Black Thunder. Other fuels (natural gas and oil & petroleum) came from 4 suppliers in 2023.
How much does it spend on fuel?
An estimated $25.4M in 2023 — coal $17.6M, natural gas $6.22M and oil & petroleum $1.5M. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
719,951 t in 2023, reported to the EPA — the 766th highest of 6,030 US facilities that reported. Down from 4.32 Mt in 2011.

Also at this site

Karn Solar Energy CenterNearby, same operator · planned→

Related pages

Michigan energyAll facilities in the state→J H Campbell1,561 MW operating capacity→ Midland Cogeneration Venture1,469 MW operating capacity→ Fermi1,281 MW operating capacity→ Blue Water Energy1,267 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming