AMERICAN ENERGY ATLAS
Power·Massachusetts

Cycz Solar Project CSG Hybrid

Worcester County, Massachusetts · ISO-NE · operated by AES Distributed Energy

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service3.3MW2 units · solar + storage
Rank in Massachusetts#273 (tied)of 666 · by capacity · #8,563 (tied) of 13,147 US

Location

Worcester County · ISO-NE · NPCC

Generating units

2 of 2 shown · 3.3 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CYCZ2.0SolarSolar Photovoltaic2020Operating
Unit BATT1.3StorageBatteries2020Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.

See the engineering record →

Ownership & operations

Operating utility
AES Distributed Energy
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
63472

Common questions

How big is Cycz Solar Project CSG Hybrid?
3.3 MW across 2 generating units in service — 2.0 MW of solar and 1.3 MW of storage.
Who owns and operates it?
Operated by AES Distributed Energy, filed as independent power producer.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2020. Every operating unit came online in 2020.
When is it due to retire?
No retirement date has been filed for any operating unit at Cycz Solar Project CSG Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (2.0 MW) and Batteries (1.3 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Massachusetts energyAll facilities in the state→Mt Wachusett Community College3.4 MW operating capacity→ WEB Brookfield3.4 MW operating capacity→ Greater New Bedford LFG Utiliz. Facility3.3 MW operating capacity→ Hurteau Solar Project Hybrid3.3 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming