AMERICAN ENERGY ATLAS
Power·California

CSU Long Beach

Los Angeles County, California · CAISO · operated by Hybrid-Electric Building Technologies West Los Angeles 1, LLC

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service2.5MW1 unit · storage
Rank in California#1,161 (tied)of 1,713 · by capacity · #9,345 (tied) of 13,147 US

Location

Los Angeles County · CAISO · WECC

Generating units

1 of 1 shown · 2.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CSULB2.5StorageBatteries2017Operating

1 unit shown. Behind it, AEA holds the full engineering record: energy capacity in MWh, charge and discharge rates and use cases; ownership stakes where a unit is jointly held.

See the engineering record →

Ownership & operations

Operating utility
Hybrid-Electric Building Technologies West Los Angeles 1, LLC
Jointly held units
SUSI Partners AG 50% of 1 unit
Sk Holdings Co. Ltd. 50% of 1 unit
Entity type
Commercial
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
63611

Common questions

How big is CSU Long Beach?
2.5 MW across 1 generating unit in service.
Who owns and operates it?
Operated by Hybrid-Electric Building Technologies West Los Angeles 1, LLC, filed as commercial. 2 owner stakes are filed on jointly held units.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2017.
When is it due to retire?
No retirement date has been filed for any operating unit at CSU Long Beach. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Batteries (2.5 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

California energyAll facilities in the state→Cawelo Water District Solar2.5 MW operating capacity→ Colton Solar One, LLC2.5 MW operating capacity→ GEN005 Antibody Fuel Cell2.5 MW operating capacity→ Gridley Main Two2.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming