Dover Plains, Dutchess County, New York · NYISO · operated by Cricket Valley Energy Center LLC · owned by Cricket Valley Energy Center LLC
2023 · headline year
Fuel spend$115M2023 · estimate
Capacity in service1,312MW6 units · gas
Net generation5.2TWh2023 · reported
CO₂ emitted1.97Mt2023 · reported to EPA · 306th highest of 6,030 in the US
Rank in New York#6of 1,018 · by capacity · #185 of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor45%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 37.4 TBtu · reported · $115M est.
CO₂ emitted, Mt · 2019–23
Reported (through 2023)
Generating units
6 of 6 shown · 1,312 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit U004
263.3
Natural Gas
Natural Gas Fired Combined Cycle
2020
Operating
Unit U005
263.3
Natural Gas
Natural Gas Fired Combined Cycle
2020
Operating
Unit U006
263.3
Natural Gas
Natural Gas Fired Combined Cycle
2020
Operating
Unit U001
174.2
Natural Gas
Natural Gas Fired Combined Cycle
2020
Operating
Unit U002
174.2
Natural Gas
Natural Gas Fired Combined Cycle
2020
Operating
Unit U003
174.2
Natural Gas
Natural Gas Fired Combined Cycle
2020
Operating
All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; ownership stakes where a unit is jointly held.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 45 deliveries recorded 2020–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by Cricket Valley Energy Center LLC (100%) and operated by Cricket Valley Energy Center LLC, filed as independent power producer.
Which grid does it sell into?
NYISO (New York Independent System Operator) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2020. Every operating unit came online in 2020.
When is it due to retire?
No retirement date has been filed for any operating unit at Cricket Valley Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $115M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
1.97 Mt in 2023, reported to the EPA — the 306th highest of 6,030 US facilities that reported. Up from 1,554 t in 2019.