AMERICAN ENERGY ATLAS
Power·Pennsylvania

Crayola Solar Project

Northampton County, Pennsylvania · PJM · operated by UGI Energy Services, LLC

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service2.8MW3 units · solar
Rank in Pennsylvania#217 (tied)of 256 · by capacity · #9,177 (tied) of 13,147 US

Location

Northampton County · PJM · RFC

Generating units

3 of 3 shown · 2.8 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 11.0SolarSolar Photovoltaic2010Operating
Unit 21.0SolarSolar Photovoltaic2011Operating
Unit 30.8SolarSolar Photovoltaic2012Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity.

See the engineering record →

Ownership & operations

Operating utility
UGI Energy Services, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
57216

Common questions

How big is Crayola Solar Project?
2.8 MW across 3 generating units in service.
Who owns and operates it?
Operated by UGI Energy Services, LLC, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2011. The oldest operating unit is Unit 1 (2010); the newest is Unit 3 (2012).
When is it due to retire?
No retirement date has been filed for any operating unit at Crayola Solar Project. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (2.8 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Pennsylvania energyAll facilities in the state→Lincoln Financial Field2.9 MW operating capacity→ Allentown - Ruppsville2.8 MW operating capacity→ Upper Macungie CSG 1 LLC2.8 MW operating capacity→ Girard (PA) RTO BTM2.7 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming