Fuel spend$02023 · no purchased fuel
Capacity in service2.2MW2 units · storage + solar
Rank in Arkansas#77 (tied)of 108 · by capacity · #9,650 (tied) of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →
How big is Craighead Electric Solar One?
2.2 MW across 2 generating units in service — 1.2 MW of storage and 1.0 MW of solar.
Who owns and operates it?
Operated by Today's Power, Inc., filed as cooperative.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2019. The oldest operating unit is Unit SOL (2018); the newest is Unit CEBA (2020).
When is it due to retire?
No retirement date has been filed for any operating unit at Craighead Electric Solar One. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Batteries (1.2 MW) and Solar Photovoltaic (1.0 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.