Fuel spend$2.26M2023 · estimate
Capacity in service100MW3 units · waste + solar
Net generation328GWh2023 · reported
CO₂ emitted233,988t2023 · reported to EPA · 1,421st highest of 6,030 in the US
Rank in Hawaii#8of 70 · by capacity · #2,382 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor37%2023
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; panel technology, tracking and DC capacity; ownership stakes where a unit is jointly held.
See the engineering record →
How big is Covanta Honolulu Resource Recovery Venture (h-Power)?
100 MW across 3 generating units in service — 97.3 MW of waste and 2.9 MW of solar.
Who owns and operates it?
How old is it?
The capacity-weighted average megawatt here came online in 1998. The oldest operating unit is Unit GEN1 (1989); the newest is Unit PV1 (2020).
When is it due to retire?
No retirement date has been filed for any operating unit at Covanta Honolulu Resource Recovery Venture (h-Power). An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned other fuels and oil & petroleum.
How much does it spend on fuel?
An estimated $2.26M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
233,988 t in 2023, reported to the EPA — the 1,421st highest of 6,030 US facilities that reported. Up from 200,505 t in 2011.