AMERICAN ENERGY ATLAS
Industrial + power·Massachusetts

Covanta Haverhill Inc

Haverhill, Essex County, Massachusetts · ISO-NE · operated by Ogden Projects Inc-Haverhill · owned by Covanta Holding Corp

2023 · headline year
Fuel spend$405,0262023 · estimate
Capacity in service46.0MW1 unit · waste
Net generation339GWh2023 · reported
CO₂ emitted235,183t2023 · reported to EPA · 1,419th highest of 6,030 in the US
Rank in Massachusetts#30of 666 · by capacity · #3,632 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor84%2023

Location

Essex County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

100% Other fuels · 5.56 TBtu · reported

CO₂ emitted, t · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 46.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN146.0Municipal solid wasteMunicipal Solid Waste1989Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Covanta Holding Corp · 100%
Operating utility
Ogden Projects Inc-Haverhill
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1005179
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
50661

Common questions

How big is Covanta Haverhill Inc?
46.0 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Covanta Holding Corp (100%) and operated by Ogden Projects Inc-Haverhill, filed as independent power producer.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1989.
When is it due to retire?
No retirement date has been filed for any operating unit at Covanta Haverhill Inc. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned other fuels.
How much does it spend on fuel?
An estimated $405,026 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
235,183 t in 2023, reported to the EPA — the 1,419th highest of 6,030 US facilities that reported. Up from 195,719 t in 2011.

Related pages

Massachusetts energyAll facilities in the state→Wheelabrator Saugus Inc.57.8 MW operating capacity→ Wheelabrator Millbury Inc47.6 MW operating capacity→ MIT Central Utility Plant43.4 MW operating capacity→ Exelon Framingham LLC42.6 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming