AMERICAN ENERGY ATLAS
Industrial + power·Indiana

Covanta Energy

Indianapolis, Marion County, Indiana · MISO · operated by Covanta Indianapolis Inc · owned by Covanta Holding Corp

2023 · headline year
Capacity in service6.5MW1 unit · waste
CO₂ emitted355,034t2023 · reported to EPA · 1,134th highest of 6,030 in the US
Rank in Indiana#108 (tied)of 202 · by capacity · #6,239 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Marion County · MISO · RFC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

99% Other fuels · 7.59 TBtu · reported1% Natural gas · 0.0659 TBtu · reported

Other fuels supplies 99% of the fuel energy its on-site power plant burned in 2023.

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 6.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN16.5Municipal solid wasteMunicipal Solid Waste1988Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Covanta Holding Corp · 100%
Operating utility
Covanta Indianapolis Inc
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1000293
Balancing authority
MISO
NERC region
ReliabilityFirst (RFC)
EIA plant ID
50647

Common questions

How big is Covanta Energy?
6.5 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Covanta Holding Corp (100%) and operated by Covanta Indianapolis Inc, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1988.
When is it due to retire?
No retirement date has been filed for any operating unit at Covanta Energy. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned other fuels and natural gas.
How much CO₂ does it emit?
355,034 t in 2023, reported to the EPA — the 1,134th highest of 6,030 US facilities that reported. Up from 283,756 t in 2011.

Related pages

Indiana energyAll facilities in the state→Anderson 66.8 MW operating capacity→ Bremen6.8 MW operating capacity→ Richmond Solar Park 36.5 MW operating capacity→ Prairie View RDF6.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming