Salt Lake County, Utah · PACE · operated by Kennecott Utah Copper
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit CSP1 | 5.0 | Solar | Solar Photovoltaic | 2024 | Operating |
| Unit CSP2 | 25.0 | Solar | Solar Photovoltaic | 2025 | Proposed |
All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit CSP2 | new unit | 2025 | 25.0 MW |