The largest power plant in Montana by capacity — 1,647 MW, 100% coal by fuel energy in 2023, first unit online in 1984.
Fuel spend$281M2023 · estimate
Capacity in service1,647MW2 units · coal
Net generation10.8TWh2023 · reported
CO₂ emitted11Mt2023 · reported to EPA · 11th highest of 6,030 in the US
Rank in Montana#1of 71 · by capacity · #128 of 13,147 US
Reported suppliers22023 · 21 deliveries
Capacity factor75%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Coal · 117 TBtu · reported · $279M est.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
4 of 4 shown · 1,647 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 3
823.7
Subbituminous
Conventional Steam Coal
1984
Operating
Unit 4
823.7
Subbituminous
Conventional Steam Coal
1986
Operating
Unit 1
358.0
Subbituminous
Conventional Steam Coal
1975
Retired 2020
Unit 2
358.0
Subbituminous
Conventional Steam Coal
1976
Retired 2020
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; ownership stakes where a unit is jointly held.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 402 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Avista Corp 15% of 2 units NorthWestern Energy (MT Hydro) 30% of 1 unit PacifiCorp 10% of 2 units Portland General Electric Co 20% of 2 units Puget Sound Energy Inc partial of 4 units Talen Montana LLC partial of 3 units
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1001020
Balancing authority
NWMT
NERC region
WECC
EIA plant ID
6076
Common questions
How big is Colstrip?
1,647 MW across 2 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
NWMT (NorthWestern Energy (NWMT)) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1985. The oldest operating unit is Unit 3 (1984); the newest is Unit 4 (1986).
When is it due to retire?
No retirement date has been filed for any operating unit at Colstrip. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned coal. Coal delivered in 2023 came from 1 coal supplier, from mines in Montana — principally Rosebud Mine&Crusher/Conveyor. Other fuels (oil & petroleum) came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $281M in 2023 — coal $279M and oil & petroleum $2.48M. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
11 Mt in 2023, reported to the EPA — the 11th highest of 6,030 US facilities that reported. Down from 14.1 Mt in 2011.