AMERICAN ENERGY ATLAS
Power·California

Collins Pine Project

Plumas County, California · CAISO · operated by Collins Pine Co

2023 · headline year
Capacity in service5.0MW1 unit · biomass
Net generation6GWh2023 · reported
Rank in California#881 (tied)of 1,713 · by capacity · #6,619 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor14%2023

Location

Plumas County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Biomass · 266,667 MMBtu · reported

Reported fuel consumption, TBtu · 2011–2023

00.511.5201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 5.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN55.0WoodWood/Wood Waste Biomass2021Operating
Unit GEN412.0WoodWood/Wood Waste Biomass1985Retired 2020

All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Collins Pine Co
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
10661

Common questions

How big is Collins Pine Project?
5.0 MW across 1 generating unit in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Collins Pine Co, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2021.
When is it due to retire?
No retirement date has been filed for any operating unit at Collins Pine Project. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass.

Related pages

California energyAll facilities in the state→CDCR (CA) - Corcoran State Prison5.0 MW operating capacity→ Citizen B5.0 MW operating capacity→ Costa View Farms5.0 MW operating capacity→ Cove Hydroelectric5.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming