AMERICAN ENERGY ATLAS
Power·Kentucky

Coleman

Hawesville, Hancock County, Kentucky · MISO · operated by Big Rivers Electric Corp

last reported to the EPA in 2021

Retired 2020

Retired — its last generating unit went out of service in 2020, ending 602 MW of capacity.

Retired capacity602MW3 units · none in service
CO₂ emittedNot reported2023 · last reported 2021
Reported suppliersNot reported2023 · last deliveries 2014

Location

Hancock County · MISO · SERC

CO₂ emitted, Mt · 2011–2021

0246201120162021
Reported (through 2021)

Generating units

3 of 3 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 1205.0Bituminous coalConventional Steam Coal1969Retired 2020
Unit 2205.0Bituminous coalConventional Steam Coal1970Retired 2020
Unit 3192.0Bituminous coalConventional Steam Coal1971Retired 2020

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 340 deliveries are on record for 2011–2014.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Big Rivers Electric Corp
Entity type
Cooperative
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001599
Balancing authority
MISO
NERC region
SERC
EIA plant ID
1381

Common questions

How big is Coleman?
602 MW across 3 units, none of which is in service — all retired.
Who owns and operates it?
Operated by Big Rivers Electric Corp, filed as cooperative.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
When is it due to retire?
It has already retired — the last unit retired in 2020.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by bituminous coal.

Related pages

Kentucky energyAll facilities in the state→Bright Mountain SolarPower facility→ Cash CreekPower facility→ Continental Refining Company LLCIndustrial facility→ Cooperative Solar Three-MarionPower facility→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming