AMERICAN ENERGY ATLAS
Power·Michigan

Coldwater Peaking Plant

Coldwater, Branch County, Michigan · MISO · operated by Coldwater Board of Public Util

last reported to the EPA in 2015

2023 · headline year
Capacity in service12.9MW3 units · gas
Net generation786MWh2023 · reported
CO₂ emittedNot reported2023 · last reported 2015
Rank in Michigan#132of 258 · by capacity · #5,093 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor1%2023

Location

Branch County · MISO · RFC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 4,648 MMBtu · reported

Reported fuel consumption, MMBtu · 2015–23

030,00060,00090,000201520192023
Reported (through 2023)

Generating units

3 of 3 shown · 12.9 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN14.3Natural GasNatural Gas Internal Combustion Engine2015Operating
Unit GEN24.3Natural GasNatural Gas Internal Combustion Engine2015Operating
Unit GEN34.3Natural GasNatural Gas Internal Combustion Engine2015Operating

All 3 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Coldwater Board of Public Util
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1012000
Balancing authority
MISO
NERC region
ReliabilityFirst (RFC)
EIA plant ID
59467

Common questions

How big is Coldwater Peaking Plant?
12.9 MW across 3 generating units in service.
Who owns and operates it?
Operated by Coldwater Board of Public Util, filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2015. Every operating unit came online in 2015.
When is it due to retire?
No retirement date has been filed for any operating unit at Coldwater Peaking Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.

Related pages

Michigan energyAll facilities in the state→Putnam (MI)13.5 MW operating capacity→ Wilmot13.5 MW operating capacity→ Water Street Station12.6 MW operating capacity→ Blue Elk VII Solar, LLC12.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming