AMERICAN ENERGY ATLAS
Power·Oregon

Coffin Butte Resource Project

Corvallis, Benton County, Oregon · BPAT · operated by Pacific Northwest Generating Coop

last reported to the EPA in 2013

2023 · headline year
Capacity in service5.6MW5 units · biomass
Net generation42.3GWh2023 · reported
CO₂ emittedNot reported2023 · last reported 2013
Rank in Oregon#149 (tied)of 278 · by capacity · #6,449 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor86%2023

Location

Benton County · BPAT · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 476,733 MMBtu · reported

Reported fuel consumption, MMBtu · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

5 of 5 shown · 5.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 41.6Landfill gasLandfill Gas2007Operating
Unit 51.6Landfill gasLandfill Gas2007Operating
Unit 10.8Landfill gasLandfill Gas1995Operating
Unit 20.8Landfill gasLandfill Gas1995Operating
Unit 30.8Landfill gasLandfill Gas1995Operating

All 5 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Pacific Northwest Generating Coop
Entity type
Cooperative
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1011083
Balancing authority
BPAT
NERC region
WECC
EIA plant ID
7725

Common questions

How big is Coffin Butte Resource Project?
5.6 MW across 5 generating units in service.
Who owns and operates it?
Operated by Pacific Northwest Generating Coop, filed as cooperative.
Which grid does it sell into?
BPAT (Bonneville Power Administration) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2002. The oldest operating units are Unit 1, Unit 2 and Unit 3 (1995); the newest are Unit 4 and Unit 5 (2007).
When is it due to retire?
No retirement date has been filed for any operating unit at Coffin Butte Resource Project. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.

Related pages

Oregon energyAll facilities in the state→Grove Solar Center, LLC6.0 MW operating capacity→ NorWest Energy 9 LLC6.0 MW operating capacity→ NorWest Energy 4, LLC5.6 MW operating capacity→ Oregon State University5.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming