Madison County, New York · NYISO · operated by Green Power Energy LLC
Capacity shown is planned or not in service
A planned 12.0 MW onshore wind turbine project, filed to come online in 2027.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit WT1 | 2.4 | Wind | Onshore Wind Turbine | 2027 | Proposed |
| Unit WT2 | 2.4 | Wind | Onshore Wind Turbine | 2027 | Proposed |
| Unit WT3 | 2.4 | Wind | Onshore Wind Turbine | 2027 | Proposed |
| Unit WT4 | 2.4 | Wind | Onshore Wind Turbine | 2027 | Proposed |
| Unit WT5 | 2.4 | Wind | Onshore Wind Turbine | 2027 | Proposed |
All 5 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit WT1 | new unit | 2027 | 2.4 MW |
| Unit WT2 | new unit | 2027 | 2.4 MW |
| Unit WT3 | new unit | 2027 | 2.4 MW |
| Unit WT4 | new unit | 2027 | 2.4 MW |
| Unit WT5 | new unit | 2027 | 2.4 MW |