Underwood, Mclean County, North Dakota · MISO · operated by Rainbow Energy Center · owned by Remc Assets LP
2023 · headline year
The largest power plant in North Dakota by capacity — 1,210 MW, 100% coal by fuel energy in 2023, first unit online in 1979.
Reported fuel cost$167M2023 · reported deliveries
Capacity in service1,210MW2 units · coal · 2 more on standby or out of service
Net generation7.17TWh2023 · reported
CO₂ emitted7.72Mt2023 · reported to EPA · 25th highest of 6,030 in the US
Rank in North Dakota#1of 55 · by capacity · #225 of 13,147 US
Reported suppliers22023 · 20 deliveries
Capacity factor67%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Coal · 78.2 TBtu · reported
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
5 of 5 shown · 1,210 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 1
604.8
Refined coal
Conventional Steam Coal
1979
Operating
Unit 2
604.8
Refined coal
Conventional Steam Coal
1980
Operating
Unit 4
3.0
Distillate oil
Petroleum Liquids
2016
Standby
Unit 5
3.0
Distillate oil
Petroleum Liquids
2016
Standby
Unit 3
2.0
Distillate oil
Petroleum Liquids
1979
Retired 2016
All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 270 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
1,210 MW across 2 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Remc Assets LP (100%) and operated by Rainbow Energy Center, filed as investor-owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1980. The oldest operating unit is Unit 1 (1979); the newest is Unit 2 (1980).
When is it due to retire?
No retirement date has been filed for any operating unit at Coal Creek. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned coal. Coal delivered in 2023 came from 1 coal supplier, from mines in North Dakota — principally Falkirk Mine. Other fuels (oil & petroleum) came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $167M in 2023.
How much CO₂ does it emit?
7.72 Mt in 2023, reported to the EPA — the 25th highest of 6,030 US facilities that reported. Down from 8.95 Mt in 2011.