Clinton County Regional Landfill

Morrisonville, Clinton County, New York · NYISO · operated by Innovative Energy Systems Inc · owned by Casella Waste Systems Inc

2023 · headline year
Fuel spend$7,2152023 · estimate
Capacity in service6.4MW4 units · biomass
Net generation47.3GWh2023 · reported
CO₂ emitted34,323t2023 · reported to EPA · 4,461st highest of 6,030 in the US
Rank in New York#244 (tied)of 1,018 · by capacity · #6,264 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor84%2023

Location

Clinton County · NYISO · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 522,706 MMBtu · reported

CO₂ emitted, t · 2011–2023

020,00040,00060,000201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 6.4 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN11.6Landfill gasLandfill Gas2008Operating
Unit GEN21.6Landfill gasLandfill Gas2008Operating
Unit GEN31.6Landfill gasLandfill Gas2008Operating
Unit GEN41.6Landfill gasLandfill Gas2009Operating

All 4 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Casella Waste Systems Inc · 100%
Operating utility
Innovative Energy Systems Inc
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1005259
Balancing authority
NYISO
NERC region
NPCC
EIA plant ID
56986

Common questions

How big is Clinton County Regional Landfill?
6.4 MW across 4 generating units in service.
Who owns and operates it?
Owned by Casella Waste Systems Inc (100%) and operated by Innovative Energy Systems Inc, filed as independent power producer.
Which grid does it sell into?
NYISO (New York Independent System Operator) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2008. The oldest operating units are Unit GEN1, Unit GEN2 and Unit GEN3 (2008); the newest is Unit GEN4 (2009).
When is it due to retire?
No retirement date has been filed for any operating unit at Clinton County Regional Landfill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.
How much does it spend on fuel?
An estimated $7,215 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
34,323 t in 2023, reported to the EPA — the 4,461st highest of 6,030 US facilities that reported. Down from 35,630 t in 2011.

Related pages

New York energyAll facilities in the state→Lower Saranac Hydroelectric Facility6.7 MW operating capacity→ Waste Management of New York, LLC6.4 MW operating capacity→ Colonie LFGTE Facility6.4 MW operating capacity→ DANC LFGTE Facility6.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming