Howell County, Missouri · SPP · operated by City of West Plains - (MO)
Natural gas supplies 81% of the fuel energy it burned in 2023. Per unit of heat, oil & petroleum costs City of West Plains Power Station an estimated 7.8× more than natural gas.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit UNIT1 | 25.6 | Natural Gas | Natural Gas Fired Combustion Turbine | 2000 | Standby |
| Unit UNIT2 | 21.8 | Natural Gas | Natural Gas Fired Combustion Turbine | 2000 | Standby |
All 2 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.
See the engineering record →