Fuel spend$133,4872023 · estimate
Capacity in service26.0MW1 unit · waste
Net generation125GWh2023 · reported
CO₂ emitted100,599t2023 · reported to EPA · 2,405th highest of 6,030 in the US
Rank in Washington#81of 128 · by capacity · #4,170 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor55%2023
1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.
See the engineering record →
How big is City of Spokane Waste-to-Energy?
26.0 MW across 1 generating unit in service.
Who owns and operates it?
Which grid does it sell into?
AVA (Avista Corporation) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1991.
When is it due to retire?
No retirement date has been filed for any operating unit at City of Spokane Waste-to-Energy. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned other fuels.
How much does it spend on fuel?
An estimated $133,487 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
100,599 t in 2023, reported to the EPA — the 2,405th highest of 6,030 US facilities that reported. Down from 100,853 t in 2011.