AMERICAN ENERGY ATLAS
Industrial + power·Washington

City of Spokane Waste-to-Energy

Spokane, Spokane County, Washington · AVA · operated by City of Spokane · owned by City of Spokane Washington

2023 · headline year
Fuel spend$133,4872023 · estimate
Capacity in service26.0MW1 unit · waste
Net generation125GWh2023 · reported
CO₂ emitted100,599t2023 · reported to EPA · 2,405th highest of 6,030 in the US
Rank in Washington#81of 128 · by capacity · #4,170 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor55%2023

Location

Spokane County · AVA · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Other fuels · 2.49 TBtu · reported

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 26.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN126.0Municipal solid wasteMunicipal Solid Waste1991Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
City of Spokane Washington · 100%
Operating utility
City of Spokane
Entity type
Municipally Owned Utility
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1004053
Balancing authority
AVA
NERC region
WECC
EIA plant ID
50886

Common questions

How big is City of Spokane Waste-to-Energy?
26.0 MW across 1 generating unit in service.
Who owns and operates it?
Owned by City of Spokane Washington (100%) and operated by City of Spokane, filed as municipally owned utility.
Which grid does it sell into?
AVA (Avista Corporation) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1991.
When is it due to retire?
No retirement date has been filed for any operating unit at City of Spokane Waste-to-Energy. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned other fuels.
How much does it spend on fuel?
An estimated $133,487 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
100,599 t in 2023, reported to the EPA — the 2,405th highest of 6,030 US facilities that reported. Down from 100,853 t in 2011.

Related pages

Washington energyAll facilities in the state→Packwood27.5 MW operating capacity→ Main Canal Headworks26.8 MW operating capacity→ Boulder Park Generating Station24.6 MW operating capacity→ Twin Falls Hydro24.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming